FWA Project Size & Quote System
Configure project requirements, generate AI-powered solutions and produce professional quotes.
Project & Site Information
Used for quote documentation only β does not affect solution
Postcode determines grid provider and eligible incentives
Auto-detected from postcode
* Required field
Partner Details
Client Details
Quote Administration
Pricing Structure
Landed Price
Cost basis pricing
Pre-landed cost basis
Wholesale Price
Standard rate
From price sheet
Structured Price
Distributor level pricing
Distributor level
Strategic Price
Landed + x% margin
Custom margin
%
Question 01
01
Agricultural
Packhouses, pumping systems, irrigation, cold-room processing.
02
Industrial & Manufacturing
Heavy inductive motor cycles, precision plants, multi-shift.
03
Commercial Complex
Corporate HQ, warehouses, clinical centres, retail.
Question 02
A
Peak Demand & Bill Reduction
Eliminate peak tariff penalties.
B
Critical Backup & Resilience
UPS-grade response, islanding.
C
Solar Yield Optimisation
Maximise self-consumption ratio.
D
Off-Grid / Microgrid
Full islanded operation.
hrs
%
Auto-detected from postcode
kWp
Double Peak
Morning & Evening pulses.
Day Heavy Shift
Matches localised solar arc.
Continuous 24h Loop
Flat line industrial draw.
Intermittent Spikes
High startup motor draws.
Single Evening Peak
Peak load after sunset.
Option A β Upload Energy Bill
Option B β Manual Input
%
$